COB LED video wall installed in 24/7 control room — DOIT VISION
HOME › solutions › Control Rooms & Broadcast
Solutions · Mission Critical COB · MIP · P0.9–P1.8 · DCI-P3 · 24/7 Rated · Novastar H-Series

LED VIDEO WALLS
FOR CONTROL ROOMS
& BROADCAST.

Same-Day Engineer Response · CAD Drawings Included · Integrator-Tier Pricing · 55+ Countries

When your client needs a display that holds up under 4K cameras, 24/7 operation, and close-up viewing — generic LED will not do. DOIT VISION’s COB and MIP series are engineered for exactly this.

P0.9–P1.8
Pixel Pitch
COB · MIP
24/7
Operation
Rated
DCI-P3
Color Space
Factory Cal.
7,680Hz
Max Refresh
MIP Series
15–45days
Lead Time
Stock to Custom
Why Control Rooms Are Different

THREE PROBLEMS
STANDARD SUPPLIERS
DON’T SOLVE.

01

Installation Drawings & Mounting Structure

Control room screens are large — 40–80㎡ — in architecturally constrained spaces. Integrators need precise CAD drawings, structural schematics, and mounting specs before a single panel ships. Most suppliers send panels. We send a complete installation package.

02

Controller Bandwidth & Driving Capacity

A 60㎡ fine-pitch wall at P1.2 carries enormous data load. Standard Novastar MCTRL is not sufficient — you need the H-series (H9, H2, H5). We specify the right controller and supply pre-configured cabinet map files at quote stage.

03

Long-Term Maintenance & Module Replacement

A control room display runs 24/7. COB technology eliminates SMD’s primary failure mode — dead pixels from physical contact. Front-access servicing without dismounting the entire structure. Spare module recommendations included.

Integrator installing COB
                Pro panels in control room environment
COB Pro installation · full mounting package supplied
5H
Surface
Hardness
10,000:1
Contrast Ratio
vs ~3,000:1 SMD
−40%
Power vs SMD
Same Brightness
Zero
Moiré Under
4K Camera
How DOIT VISION Solves It

ENGINEER-LED
FROM BRIEF TO COMMISSIONING.

DOIT VISION engineer reviewing
            CAD drawing and mounting schematics
EXPERTISE · Full Installation Package

CAD Drawings.
Not Just Panels.

Every control room quote includes: CAD drawings, mounting frame schematics, weight distribution calculations, levelling system specs, and panel layout diagrams — formatted for your client presentation or structural engineer.

Standard drawings delivered within 3–5 working days of quote confirmation. White-label versions available for all documentation.

COB Pro: CE · EMC · RoHS
SPEED · Same-Day Response

Engineers Answer.
Not Sales Reps.

Send your brief via WhatsApp or email. An LED engineer responds the same day with controller specification, pixel pitch recommendation, and preliminary pricing. No ticket queues. No sales coordinators relaying your technical questions.

Our 15 in-house engineers average 10+ years in fine-pitch manufacturing. You get accurate answers on thermal load, pixel geometry, and controller compatibility from day one.

Response time: same business day (9AM–9PM China Time)
DOIT VISION engineer
            responding to integrator brief via WhatsApp
Novastar H-series
            controller with pre-configured cabinet map for control room
FIT · Controller & Commissioning

Pre-Configured.
Map Files Included.

Panels ship pre-configured for your specified controller — Novastar H-series (H9, H2, H5), or Colorlight Z-series. Cabinet map files, receiving card layout, and config USB included in every shipment.

Multi-zone installations tested as a complete system before crating. Remote commissioning support available during your installation window.

Novastar · Colorlight — all pre-configured
Recommended Products

FINE-PITCH LED FOR
CONTROL ROOMS & BROADCAST.

Three series covering the full range — from flagship 24/7 COB to HDR broadcast MIP, and a cost-effective COB for standard NOC installs.

Control Rooms & Broadcast 2
Flagship

COB Pro

Primary choice for mission-critical control rooms and on-air broadcast walls. Flip-chip COB, DCI-P3, 40% lower power vs SMD, 100,000hr lifespan.

Pixel pitch: P0.9 / P1.2 / P1.5
Cabinet: 600×337.5mm · 16:9
Contrast: 10,000:1 · DCI-P3
Refresh: up to 7,680Hz · 24/7 rated
Control Rooms & Broadcast 3
Broadcast HDR

MIP Series

For broadcast studios where 4K camera accuracy is non-negotiable. HDR10, 21-bit grayscale, best-in-class colour consistency. Individual LED repairable.

Pixel pitch: P0.9 / P1.2
HDR10 · 21-bit grayscale
Refresh: 7,680Hz · DCI-P3
Individual LED repairable
Control Rooms & Broadcast 4
Best Value

COB Beta

Same COB encapsulation in a standard 640×480mm cabinet. Direct integration into existing control room infrastructure. Fastest lead time from stock.

Pixel pitch: P1.2 / P1.5 / P1.8
Cabinet: 640×480mm (standard)
Full COB encapsulation
Lead time: 15–25 days (stocked)
Case Studies

REAL PROJECTS.
REAL INTEGRATORS.

All Case Studies →
Technology Comparison

COB VS MIP VS SMD.
THE HONEST COMPARISON.

Including when SMD is still the correct choice — and when it is not.

Specification Premium SMD COB (Pro / Beta) MIP Series
Pixel Pitch P1.2 – P2.5 P0.9 – P1.8 P0.9 – P1.2
Surface Exposed lamps Encapsulated · 5H Encapsulated
Contrast ~3,000:1 10,000:1 10,000:1+
Color Space sRGB / partial DCI-P3 DCI-P3 DCI-P3 + HDR10 · 21-bit
Refresh Rate 1,920–3,840Hz 3,840–7,680Hz 7,680Hz
4K / 8K Camera Limited Excellent Excellent + HDR
Power vs SMD Baseline ~40% lower ~30% lower
24/7 Operation Not recommended Rated for 24/7 Rated for 24/7
Best For Viewing >4m, signage Control rooms, NOCs, broadcast HDR broadcast, premium studios
Track Record

PROVEN IN
55+ COUNTRIES.

“A 24/7 government surveillance project in China — COB Pro P1.2, 60㎡ seamless wall, Novastar H9 configuration. Full mounting drawings, pre-configured controller, calibration report. Delivered in 28 days from order.”

AV Integrator · China · Government · 2024

Every project is reviewed by our in-house engineers before production. Same-day engineer response, engineer-to-engineer. No ticket queues.

55+
Countries
Served
15
In-House
Engineers
10+
Avg. Engineer
Experience (Yrs)
SAME
DAY
Engineer
Response

“Every week an integrator sends a control room brief with a pixel pitch finer than the viewing distance needs. Sometimes P1.2 is right. Sometimes P1.5 saves 25% with zero visible difference at the actual seat distance. And sometimes they describe a 90° corner join that three other suppliers declined — and that’s exactly where we start the CAD. We don’t quote what’s in the catalogue. We engineer what the project needs.“

Kris Liang
Co-Founder & Lead Engineer, DOIT VISION · 19 Years in LED Engineering →
FAQ

QUESTIONS BEFORE
SPECIFYING.

For viewing distances under 2m, P0.9–P1.2 COB is standard. For 2–4m, P1.2–P1.5 is typically sufficient. Quick rule: minimum viewing distance (metres) ÷ 0.8 = recommended pixel pitch (mm). Example: 1.6m → P1.2 or finer. Our engineers validate your room layout before you commit — send dimensions for a same-day recommendation.
For walls above 30–40㎡ at fine pitch, standard MCTRL is insufficient. You need the Novastar H-series: H9 for large single-zone, H2 or H5 for multi-zone configurations. We specify the correct controller at quote stage and supply pre-configured cabinet map files — so your team is not figuring out card mapping on-site.
Yes. Every control room project includes: CAD drawings, mounting frame schematics, weight distribution calculations, levelling system specifications, and panel layout diagrams. Standard drawings delivered within 3–5 working days. White-label versions available.
COB encapsulates LED chips directly onto the PCB — sealed surface, 5H hardness, no exposed lamp contacts. This eliminates SMD’s primary failure mode: dead pixels from physical contact during cleaning. COB also runs approximately 40% cooler, reducing HVAC load in sealed control rooms.
COB Beta stocked SKUs: 15–25 days. COB Pro and MIP standard: 30–45 days. Custom configurations (corner joins, non-standard cabinets): add 2–3 weeks. Written lead time commitment at quote stage — not an estimate.
Yes. 90° seamless corner joins, L-shaped walls, and non-standard aspect ratios are standard engineering scope. Custom corner modules designed in-house — PCB layout, structural frame, and pixel geometry all engineered per configuration. Send a CAD or sketch for a same-day feasibility assessment.
Yes. Renamed spec sheets, white-label datasheets, OEM-branded packaging, and OEM serial numbers available for qualified integrator partners. Your client does not need to know our name is on the panel.
Free Tool
LED Display Calculator

Calculate pixel pitch, resolution, screen dimensions, and optimal viewing distance in 30 seconds.

Calculate Now →
Related Reading

TECHNICAL GUIDES
FOR SPECIFIERS.

What is an All-in-One LED Display? All in One LED Display For Sale
LED DISPLAYSAUTHOR: DOIT VISION

What is an All-in-One LED Display? All in One LED Display For Sale

An all-in-one LED display is a direct-view LED screen that combines the display panels, power supply and display...

Read Case Study
HDR400 vs HDR10: HDR400 Is Entry-Level — What Differs
LED DISPLAYSAUTHOR: DOIT VISION

HDR400 vs HDR10: HDR400 Is Entry-Level — What Differs

Buyers often mix up HDR400 and HDR10. HDR400 is an entry DisplayHDR brightness tier (~400 nits). HDR10 is...

Read Case Study
QLED vs UHD: Not Rivals — One Is a Panel, One Is a Resolution
LED DISPLAYSAUTHOR: DOIT VISION

QLED vs UHD: Not Rivals — One Is a Panel, One Is a Resolution

QLED and UHD are not rivals. QLED describes how a panel makes colour (quantum-dot LCD). UHD describes pixel...

Read Case Study
Manufacturer
DOIT VISION
Founded
2013, Shenzhen, China
Countries Served
55+
Core Engineers
15 in-house
Team Size
60 (Shenzhen HQ)
Industry Experience
19 years (Kris Liang)
Certifications
CE, EMC and RoHS on COB Pro, Block, Brick, Square 1000, Square 960 and LED Film; CE and EMC on Matrix 500 with a TÜV tensile test report; CB on Square 1000 and Square 960
Control Systems
Novastar, Colorlight, Linsn
Primary Topic
LED Control Room Displays
Content Type
Solution Page
Content Reviewer
Kris Liang, Co-Founder, 19 years LED engineering
Last Reviewed
July 2026
Get in touch
Start your project.
We respond same day.
Send your room dimensions, pixel pitch requirements, or project brief — an engineer replies within hours.
Same-day engineer response  ·  CE · EMC· RoHS
Manufacturer
DOIT VISION
Founded
2013, Shenzhen, China
Headquarters
Shenzhen, Guangdong, China
Certifications
CE, FCC, RoHS, CB, ISO 9001
Official Website
https://www.doitvision.com/