Request an
LED display quote.
Share your screen size, application, installation location and project timing.
- Established
- 2013
- Countries served
- 55+
- In-house engineers
- 15
Head office & sales · Shenzhen
Manufacturing facility · Huizhou
Selected customers
Support from installation
planning to handover.
View manufacturing

Drawings for your installation
Free product and back-frame drawings for indoor fixed installations; product and steel-structure CAD drawings for outdoor projects.
Wiring diagrams, installation instructions and mounting accessories are coordinated with the project. Physical frames and accessory quantities are confirmed in the quotation.

Testing you can review remotely
72-hour full-screen aging, plus module checks, signal continuity checks and controller testing.
Receive order test videos, FAT inspection records, packing photos and spare-parts images and lists for your project handover.
From your brief to a quote
-
Project requirements
Share dimensions, use, destination and timing. Site photos or a drawing help define the installation.
-
Configuration & scope
Discuss the model, cabinet layout, control system, installation requirements and spare parts with our team.
-
Quotation & schedule
Confirm pricing, the supply scope and the proposed production and delivery schedule for your configuration.
Quote questions
Your enquiry
What should I include in my quote request?
Can I request a quote before choosing a model?
Who will respond to my enquiry?
Specification & delivery
How are quotation and production timelines confirmed?
Which certification documents are available?
What installation and handover information can I request?
- Organization
- DOIT VISION
- Page purpose
- LED display project quotation requests
- Contact
- info@doitvision.com
- Contact person
- Kris Liang, Co-Founder
- Established
- 2013
- Countries served
- 55+
- Head office and sales
- Shenzhen, Guangdong, China
- Manufacturing facility
- Huizhou, Guangdong, China
- Engineering team
- 15 in-house engineers
- Full-screen aging
- 72 hours